Planning a Roof Replacement Near Charlotte? What the Process Looks Like
Knowing what happens at each step of a replacement makes it easier to compare contractors — Best Choice Roofing included — and to spot one that skips a step. Here is the typical sequence for a residential re-roof around Charlotte.
Independent directory · Not affiliated with Best Choice Roofing
81,000+
Roofing listings
All 50
States plus DC
Free
To browse, no sign-up
Best Choice Roofing and local alternatives
Best Choice Roofing works across the Charlotte suburbs, and so do independent roofers listed on the National Roofing Directory in Huntersville, Matthews, Mooresville and Kannapolis.
A typical roof replacement, step by step
Inspection and measurements
The roofer inspects the roof and attic and measures the roof, often from satellite or drone imagery.
Written proposal
Materials, scope, price, payment schedule and warranty, all in writing.
Scheduling and delivery
Shingles and underlayment are usually delivered shortly before the crew arrives.
Tear-off and deck inspection
The old roof comes off and any soft or damaged decking is replaced.
Installation
Underlayment, ice-and-water membrane, drip edge, flashing, shingles, ridge vent and pipe boots.
Clean-up and final walkthrough
A magnetic sweep for nails in the yard and driveway, photos of the finished roof, and a walkthrough with you before final payment.
How long a replacement takes
Most single-family re-roofs take one to three days on site, depending on size, pitch, decking repairs and weather. Scheduling can take longer after a big storm, when demand for roofers spikes.
Getting your home ready for the crew
- Move vehicles out of the driveway and garage approach
- Take pictures and mirrors off walls — hammering can shake them loose
- Cover belongings stored in the attic
- Keep children and pets away from the work area
Roofers in the Charlotte suburbs
Huntersville and Matthews are in Mecklenburg County, Mooresville is in Iredell County, and Kannapolis spans Cabarrus and Rowan counties. Many contractors serve the whole metro area.
Roof replacement process questions
How long does a roof replacement take?
Most single-family homes take one to three days on site; complex roofs, large decking repairs or bad weather can extend that.
Do I need to be home during the replacement?
Not for the whole job, but plan to be available at the start and for the final walkthrough before you make the final payment.
What happens if the crew finds rotten decking?
It is replaced before the new materials go on. Your contract should state the per-sheet price so the change is predictable.